Which purchased parts
need attention today?
A daily list for the buyer: what is due for review, what is already covered, and the reason behind every flag.
| Part | Last bought | Typical gap | Lead time / source | On hand | Open PO | Status | Why flagged |
|---|---|---|---|---|---|---|---|
| AR-1042CrucialHydraulic fitting, ½ in | Mar 22 | 30 days | 12 daysvendor confirmation | — | — | Due for review | Next purchase expected in 3 days; lead time plus buffer is 19 days; nothing on hand or on order. |
| AR-2210Gasket kit, pump housing | Feb 27 | 45 days | 21 daysreceipt history | 6 | — | Due for review | Next purchase was expected 5 days ago; lead time plus buffer is 28 days; 6 on hand covers only about 9 days. |
| AR-3307CrucialBearing, flange mount | Feb 26 | 60 days | 35 daysreceipt history | — | — | Due for review | Next purchase expected in 9 days; lead time plus buffer is 42 days; nothing on hand or on order. |
| AR-1180Pressure switch | Mar 30 | 40 days | 18 daysvendor median | — | PO 5512 | On order | Open PO 5512, due Apr 22, already covers the next purchase. |
| AR-4415Nozzle tip, 2.5 mm | Mar 21 | 28 days | 10 daysreceipt history | 140 | — | Stock covers | Next purchase expected today, but 140 on hand covers about 39 days, more than the 17-day window. |
| AR-2876Hose assembly, 10 ft | Apr 5 | 35 days | 14 daysreceipt history | — | — | Watch | Next purchase expected in 22 days, inside two 21-day windows. |
| AR-5021Control relay | Apr 9 | 90 days | 25 daysvendor confirmation | — | — | Not due | Next purchase expected in about 12 weeks. |
| AR-3950Valve seat, stainless | Jan 10 | 30 days | 16 daysreceipt history | — | — | Lapsed | Overdue by 68 days, more than two typical gaps; demand may have stopped. Review before buying. |
| AR-6603Sight glass, 3 in | Jan 18 | — | 20 daysitem record | — | — | One-time purchase | Bought once in 12 months: a purchase, not a pattern. Never flagged to buy. |
How it decides
For each purchased part: the typical time between purchases, from its own history (or its vendor’s, when the part has too little). The lead time comes from the vendor’s confirmed date when there is one, otherwise from past receipts. A part is due for review when its next expected purchase falls inside the lead time plus a 7-day buffer and nothing on hand or on order covers it.
What this does not do. It estimates purchasing cadence; it does not forecast demand or predict a stockout. A flag means a buyer should look, not that the shop is about to run out. The company, parts, and figures are fictional.
What this demonstration runs
The statuses and reasons are computed by a Python script from invented purchase history, using the same rules as the purchasing tool I built. Search and filters operate on the saved report. Nothing here connects to a live system.